Gilgit-Baltistan

Sharm Al-Sheikh Indo-Pak Joint Statement: A Different Perspective

As the din and the dust raised by the Sharm al-Sheikh document settles down, it seems to be opening new possibilities for India to effectively deal with the emerging situation in Pakistan by finally being able to encourage and back ideas of democratic federalism and non sectarian polity in that country. The reference to Baluchistan in the Sharm al-Sheikh Joint Statement has invited the sharpest reactions. But, has not that reference elevated the issue of continuing Pakistani persecution of the Baluchs to an international level?

Bhasha Dam: A Tomb Stone of Gilgit-Baltistan’s Aspirations

This year Pakistan is facing an acute water shortage and the shortage during the current Rabi crop is estimated to be around 35 to 40 per cent, which will adversely affect the wheat output, critical for the country’s food security. Pakistan also faces an acute power shortage, which has exacerbated by the reduced outflow from Tarbela Dam. To tide over the problems, Pakistan is building Bhasha Dam on River Indus, which is the largest dam being built in Pakistan since Tarbela was completed in 1976. Continuous silting has reduced the storage capacity of Tarbela and Mangla dams considerably.

Gilgit-Baltistan: The Roots of Political Alienation

Gilgit-Baltistan in Pakistan-Occupied Kashmir has witnessed a series of political disturbances and violence over the past years. Though many analysts have viewed the often-violent assertions by otherwise peaceful residents of this remote and mountainous region as occasional eruptions of the Shia-Sunni sectarian divide, a careful examination will indicate the deeper roots of alienation of the population in this long-neglected region.

Rumblings in the Northern Areas

Pakistan seems to have realised that with the silting of Tarbela Dam (it has lost more than 30 per cent of its storage capacity), it needs to build at least one, if not two, mega dams on the Indus at the earliest. President Musharraf has made an impassioned plea for the construction of new reservoirs and canals to ensure sustainable agricultural development