BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//MP-IDSA - ECPv6.15.12.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://idsa.in
X-WR-CALDESC:Events for MP-IDSA
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Kolkata
BEGIN:STANDARD
TZOFFSETFROM:+0530
TZOFFSETTO:+0530
TZNAME:IST
DTSTART:20220101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Kolkata:20230904T053000
DTEND;TZID=Asia/Kolkata:20230904T053000
DTSTAMP:20261123T071830
CREATED:20231223T130848Z
LAST-MODIFIED:20231224T125555Z
UID:62912-1693805400-1693805400@idsa.in
SUMMARY:Monday Morning Report on India-Nepal Hydro Energy Cooperation: Challenges and Prospects
DESCRIPTION:Dr. Nihar R. Nayak\, Research  Fellow\, Non-Traditional Security Centre\, Manohar Parrikar  Institute for Defence Studies and Analyses\, spoke on “India-Nepal  Hydro Energy Cooperation: Challenges and Prospects” at the Monday Morning Meeting  held on 4 September 2023. The meeting was moderated by Dr.  Opangmeren Jamir\, Research Analyst\, East Asia Centre\, MP-IDSA. The Director  General\, Ambassador Sujan R. Chinoy and the scholars  of the Institute participated in the discussions.  \nExecutive Summary\nNepal has a huge  potential for hydro-energy cooperation. India and Nepal share a lot of common  interests in developing Nepal’s hydro energy projects and both States are  taking significant steps in this direction. Despite this\, there remain several  challenges that need to be addressed by both sides. India remains concerned about  the increasing presence of Chinese companies in the development of various infrastructure  projects in Nepal. Nepal on the other hand complain about consistent delays in  the timely completion of projects undertaken by Indian companies in Nepal. \nDetailed Report\nDr. Opangmeren Jamir gave  a brief introduction to various aspects of India-Nepal Hydro Energy  Cooperation. He mentioned that cooperation on hydro energy projects between  India and Nepal offers huge prospects for energy security and economic  development in both the countries. He highlighted that hydroelectricity  cooperation was also on the agenda of the Nepalese Prime Minister’s last visit  to India. During this visit several bilateral agreements were signed between  both the countries. During his introductory remarks\, Dr. Jamir also highlighted  the importance of the recently signed India-Nepal-Bangladesh tripartite power  trade agreement through which Nepal agreed to supply 500 megawatts of  electricity to Bangladesh. Dr. Jamir then invited Dr. Nihar R. Nayak to make  his presentation on the topic.  \nDr.  Nayak started  his presentation by highlighting that Nepal has around 6000  rivers and rivulets with an annual flow-224.5 billion cubic meters and a total  catchment area of 145\,723 square kilometres. He mentioned that the abundance of  these rivers and the rate of water flow in these\, makes Nepal undertake  investments in hydropower projects. Dr. Nayak highlighted that Nepal has a  technical potential to generate around 45\,610 MW of electricity from 66 potential  hydro-electric sites in the country. He pointed out that Nepal in June 2021  reported a surplus amount of electricity generation in the country and it  currently has around 125 active projects that contribute to 2\,822 MW total  production. The country presently exports around 452.6 MW of electricity and  has proposed to export around 600 MW by the end of 2023. Dr. Nayak highlighted  that despite all these estimates Nepal remains a “net importer” of electricity  while it aims to become a “net exporter.” Commenting on a  report titled ‘Policy Arrangement regarding Power Purchase and Sale-2080 BS’\, Dr.  Nayak mentioned that Nepal wants to be self-reliant to meet its electricity  needs and by 2030 it aims to achieve the hydroelectricity production target of  around 10\,000MW. He highlighted that Nepal by 2030 also wants to be a key hydro  energy exporter in South Asia and it seeks to extend a power purchase agreement  of 50 years with India. \nSpeaking on India-Nepal  bilateral relations and both the countries’ cooperation on hydro energy  projects\, Dr. Nayak mentioned that as per the 1950 Treaty\, it was declared that  if “the Government of Nepal decides to seek foreign assistance in regard to the  development of the natural resource\, Nepal shall give first preference to the  Government or the nationals of India”. Dr. Nayak mentioned that India has  developed 15 different kind of hydro energy projects in Nepal. He also  discussed several important bilateral agreements and legal frameworks signed  between the two countries in the hydro energy sector that included the Power  Exchange Agreement (1971)\, an Agreement on Electric Power Trade\, Cross-border  Transmission Interconnection and Grid Connectivity (2014) and Procedure for  Approval and Facilitating Import/Export (Cross Border) of Electricity\, Central  Electricity Authority (CEA) signed in 2021. He mentioned that of these three\,  ‘Procedure for Approval and Facilitating Import/Export (Cross Border) of Electricity’  is seen negatively in Nepal. India under this framework has restricted  electricity imports from Nepali projects that have any Chinese involvement. \nCommenting on  the power transmission lines between India and Nepal\, Dr. Nayak mentioned that  both countries have an extensive network of 33kV\, 132kV and 400kV power  transmission lines between the two countries. In August 2023 India has further  agreed to invest $679.8 million under Line Of Credit for the construction of  transmission lines and sub-stations. Highlighting the current status of  cooperation between India and Nepal\, Dr. Nayak mentioned that both countries in  April 2022 issued a Joint Vision Statement on the Hydropower Sector for  mutually beneficial cooperation. Nepal’s Electricity Authority (NEA) and  India’s Power Trading Corporation (PTC) in May 2023 signed a 5-year power sale  agreement. Further in June 2023\, India agreed to import 10\, 000 MW of  electricity from Nepal for a period of 10 years. Further\, India-Nepal-  Bangladesh as a part of a trilateral power transaction arrangement\, have agreed  in principle to export 40MW electricity from Nepal to Bangladesh. \nDr. Nayak in the  second part of his presentation talked about the Nepali perspectives on hydro energy  cooperation with India. He mentioned that most people within the Nepalese Government  see hydropower agreements with India as one-sided agreements that to an extent  compromise Nepalese interests. Dr. Nayak also pointed out that some within the  Nepali strategic spheres also view these as threats to Nepal’s sovereignty. He  further highlighted that there are some who even claim that India treats its  hydro energy projects in Nepal as a ‘strategic product’. Dr. Nayak mentioned  that Nepal even blames India for deliberately delaying Nepal the permissions to  export its surplus power despite both countries’ mutual understanding at the PM  level. He lastly pointed out that there also remains consistent uncertainty  about India buying electricity from Nepal\, which raises overall economic  concerns for the country. \nIn  the final part of his presentation\, Dr. Nihar Nayak highlighted various  challenges and opportunities for India-Nepal hydro energy cooperation. He  highlighted several bureaucratic challenges on the Indian side of which ‘lack  of inter-ministerial coordination’ remains at the forefront. He mentioned that  on the Nepali side\, the Government needs to take a balanced approach in terms  of equal distribution of hydro energy projects between India and China.  Further\, Nepal needs to strengthen the weak power transmission infrastructure  on its side in the region. Dr. Nayak   also pointed out the environmental damage due to these hydro energy  cooperation projects in several areas of Nepal. Lastly\, on India’s part\, Dr.  Nayak pointed out that India should undertake timely completion of its pending  hydro energy projects. It also needs to adopt flexibility in implementing  2021-cross border energy trade guidelines. He mentioned that India should  consider re-activating the irrigation and power potential of the Koshi and  Gandaki barrage. India should further call for ‘trilateral collaborations’ by  involving multilateral institutions and should encourage private sector participation  in Nepal’s hydro energy projects. \nQuestions and Comments \nPost his presentation\, Dr.  Opangmeren Jamir invited Ambassador Sujan R. Chinoy to make his comments  on the subject. Dr. Jamir later opened the floor to the  participants for their comments and questions.  \nAmbassador  Sujan R. Chinoy commented on China’s emerging dominance  in Nepal’s hydro energy and other infrastructure projects  and questioned the Speaker on the ways through which India can keep Chinese  dominance away from such projects. He mentioned that a large part of India’s  energy demands by 2030 would be met by non-fossil fuel-based resources under  India’s call for ‘panchamrit’ and its call for transition to other green  initiatives. Ambassador Chinoy highlighted that India should seek various  measures to integrate Nepal and other South Asian countries into these  initiatives. On the issue of timely completion of India’s existing  infrastructure projects in Nepal\, Ambassador Chinoy mentioned that India needs  to find credible ways to deal with the issue and find the reasons for such  delays in these projects. Lastly\, he asked the Speaker if there is a  multiplicity of decision-makers on the Indian side that creates various  challenges for their timely completion.   \nDr.  Ashok K. Beheuria highlighted the issue of changes  undertaken by India in its Power Purchase Agreement with Nepal and Nepalese  response to it. He further mentioned that India can play a vital role in  emerging new power transmission lines from Nepal for supplying electricity to  Bhutan and Bangladesh and these can be used by India for its own geopolitical  advantages. Dr. Beheuria further highlighted the need to enhance the  participation of its private companies in undertaking various projects in Nepal  and pushing them for the timely completion of projects. He asked the Speaker about  the possibilities of India inviting other friendly countries for undertaking infrastructure  development projects in Nepal.   \nDr.  Anand Kumar asked the Speaker if India could use the  Bhutan model to address its existing hydro energy infrastructure challenges  with Nepal. He mentioned that the Chinese are well aware of the fact that the  power generated from their hydroelectricity projects in Nepal\, would be for  sale to India and other South Asian countries. He  mentioned that the Chinese have no intention of taking the electricity  generated from their projects to their border villages or elsewhere. \nCol.  Vivek Chadha highlighted that the impression from the Speaker’s  presentation was that the blame of most of the problems that are limiting  India-Nepal hydro energy cooperation is on India. He asked the Speaker to  explain whether it is indeed true and whether people on the Indian side also  believe in the discourse. \nDr. Nihar R Nayak gave detailed explanations to all the  questions and comments.   \nReport prepared by Mr. Bipandeep  Sharma\, Research Analyst\, Non-Traditional Security Centre\, MP-IDSA\, New Delhi.
URL:https://idsa.in/idsa-event/monday-morning-report-on-india-nepal-hydro-energy-cooperation-challenges-and-prospects
CATEGORIES:EVENT REPORT
ATTACH;FMTTYPE=image/jpeg:https://idsa.in/wp-content/uploads/2023/11/no_photo-200x150-2.jpg
END:VEVENT
END:VCALENDAR